BIM
PERI provides a range of BIM and 5D services to benefit all aspects of formwork and scaffold design in conjunction with our construction software company, CENTRIO.
Enabling 5D formwork and scaffolding design with BIM capability maximises the return on resources such as labour and material assets, before projects begin on site and throughout their lifecycle.
PERI integrates its own systems with Autodesk® 360 Glue and Field to enable all stakeholders to have access to information via easily accessible interfaces.
Specialising in the digitalization of the construction industry, CENTRIO offer a range of software with the aim of improving collaboration and coordination across all stakeholders within a project.
CENTRIO CLM can be used to link all data and documents throughout the lifecycle of a construction project.
Click here to learn more about BIM
Cloud Systems and Software
Drawings, documents and models from CENTRIO software, PERI CAD 3D and other applications can all be called upon through the Autodesk® BIM software. A range of applications are available within this environment such as PERI ELPOS formwork planner, Library+ for planning in Revit® and myPERI customer portal to access technical and administrative documents for any project from any location.
Discover more about CENTRIO
PERIpath
Developed by CENTRIO, PERIpath combines with PERI UP system scaffolding to form our unique Integrated Scaffold Programme.
PERIpath is a unique tool to understand the utilization of scaffold assets, where erection and dismantling phases are taking place, and the labour resources required to complete.
Contractors, EPC’s and plant owners can improve planning processes and increase on-site safety by reducing the risk from mixing of scaffold components from various OEM’s. PERI offers guaranteed product Quality Assurance and Quality Control enabling significant increases in safety.
The ISP provides detailed scaffolding target estimates based on actual design detailing equipment, labour and cost, by work package and work area, using 3D modelling.
Cost certainty can be achieved through a reduction in equipment requirements, improved labour efficiency, monitoring and management. Actual crew performance against estimated work hours can be reviewed to take corrective actions and prevent significant budget overruns from occurring.
Discover more about PERIpath