As part of a critical infrastructure upgrade, the reconstruction of the Highway 401 East Collectors Lane over Leslie Street is now underway. The project involves the complete demolition and rebuilding of the existing bridge, including new abutment walls, piers, pier caps, and bridge deck, all while maintaining live traffic flow on Leslie Street below. To support the demanding formwork requirements of the project, Brennan Paving turned to PERI for a reliable and adaptable solution. The scope included formwork for uniquely shaped abutment walls of varying heights and three pier caps, each with gradually increasing lengths, a challenge that required both technical expertise and design flexibility. 

Main Application
Bridges
  • Benefits
    • Safety
    • Fast cycling
    • Efficiency
  • Are you building a project like this?

    Our products and services will make your construction work safer, faster and more efficient.

    Contact us through our website to discuss your project and find out how we can help.

The Project

Impressions from the project process

Project Information

"The site guys really liked the VPS system and said they’d use it again on a project with fewer site limitations. Even with the constraints, it just took them a bit of time to get comfortable with everything, but by the end of the project, they were using it as efficiently as it was meant to be.”
Matt Colins
Site Superintendent, Brennan Paving and Construction
Are you building a project like this?

Our products and services will make your construction work safer, faster and more efficient. Contact us through our website to discuss your project and find out how we can help.

Leslie Bridge
Leslie Bridge