75 James

75 James
Hamilton, Ontario, Canada

Rising from the heart of downtown Hamilton, 75 James is poised to become the city’s next architectural landmark. Built by Limen Group, the 35-storey residence combines bold vertical design with a refined five-storey podium. Offering 32,000 square feet of amenity and living space atop four levels of underground parking, the tower will house 616 modern suites, all within a community shaped by 124,000 m² of cast-in-place concrete, set to be completed within an ambitious 32-month schedule. Just steps from the front door, residents will find James Street’s vibrant mix of markets, boutiques, restaurants, and entertainment, positioning 75 James as a front-row seat to Hamilton’s urban energy. 

Main Application
Residential and Multi-Storey
  • Benefits
    • Safety
    • Reduce crane use
    • Efficiency
  • Are you building a project like this?

    Our products and services will make your construction work safer, faster and more efficient.

    Contact us through our website to discuss your project and find out how we can help.

The Project

Impressions from the project process

Project Information

Utilizing PERI Systems on this project enhanced both safety and efficiency. The MAXIMO system proved to be intuitive for both new and seasoned workers. The PERI SKYDECK was straightforward, with workers finding it lighter and easier to use, resulting in a boost in productivity. PERI SKYTABLE is a highly efficient, well-designed system that’s easy to assemble, with a lever mechanism that simplifies the lowering of the tables. The adaptability between systems allowed for seamless integration. From engineering to on time equipment delivery, PERI consistently met their commitments.
John Mackinnon
Formwork Planning Manager | Limen Group
Are you building a project like this?

Our products and services will make your construction work safer, faster and more efficient. Contact us through our website to discuss your project and find out how we can help.

75 James
75 James