|
The advantage of the system was seen in using the MULTIPROP towers. They were assembled on the ground and then simply raised into place.
|
|
Two 175 m high piers, at a distance of 472 m from each other, take the loads of this cable stay construction, which connects both sides of the Cooper River.
|
|
This very spectacular bridge project in southwest France was designed by the English architect, Sir Norman Forster.
|
|
Faster shoring with a simple system MULTIPROP post-shore, GT 24 Girders
|
|
Where constructing foot bridges over railway lines the closure time must be minimized. The PERI engineers in Barcelona aware of this limitation decided on a prefabricated section which could be craned into position.
|