Skyscrapers

Chocolate Condominiums, Calgary, Alberta Elite Formwork Inc. decided to use the PERI UNIPORTAL table system. By using this system, tables ranging in size from 16 ft x 26 ft (4.80 m x 8.00 m) were effectively flown by using the self leveling C-Hook.
Beauxarts Condominiums, Montreal, Quebec On this project, PERI supplied the SKYDECK slab formwork system, TRIO wall formwork and KG climbing brakkets.
Block 30, Portland, Oregon PERI SKYDECK system uses a drophead technology which allows the shores to stay in place during the stripping procedure.
University Club Tower, Milwaukee, Wisconsin PERI‘s ACS (Automatic Climbing System) was chosen for this project because Findorff wanted to run the shear walls ahead of the horizontal slabs.
The Regatta, Chicago, Illinois The Lakeshore East development area in Chicago is a 26 acre parcel of land located on the South bank of the Chicago River at Lake Michigan. This area will be a host to over 25 new structures in the next few years.