Herridge Feedermain Valve Chambers, Mississauga, Ontario


Feedermain valve chamber constructed in only 2 pours



To meet the increasing demand for water in the west half of Mississauga and Brampton, a new water feedermain is being constructed from Lorne Park Water Treatment Plant to Herridge Reservoir in the City of Mississauga. Included in the scope of work is construction of line valves and chambers at selected locations. Using RUNDFLEX circular wall formwork the forming contractor, Curb-Con Inc. out of Woodbridge, ON was able to pour the entire shaft in only 2 pours. PERI supplied MULTIFLEX for 6.50 m high shaft slabs as well.

PERI Systems In Use
  • RUNDFLEX Circular Wall Formwork
  • GT 24
  • MULTIFLEX Girder Slab Formwork

  • Al Low


    Site Superintendent

    “PERI not only provided us with user friendly blueprints and on site assembly instructions, but also RUNDFLEX system is so well designed that my crew quickly and easily learned to work with it.”

    Contractor
    Curb-Con Inc., Woodbridge, ON
    Field Service: PERI Formwork Systems, Inc., Canada