Patina – YMCA, Vancouver, British Columbia
4 day cycle achieved using ACS in landmark 43 storey high condominium
Patina located in downtown Vancouver, British Columbia, is a landmark 43 storey high, 818 m2 per level residence with 256 suites. To meet the 4 day pour cycle requirement of the jobsite, ACS self climbing formwork system was chosen to form the 9.60 m by 9.90 m core. The ACS P is a self-climbing formwork system with integrated working platform. The patented PERI hydraulic climbing mechanism raises the ACS unit to the next pour without the need of a crane. On the single sided parking level walls TRIO panels with SB brace frames and on the double sided walls MAXIMO panel wall formwork system was used.
|
| PERI Systems In Use |
MAXIMO Panel Wall Formwork
ACS P Self Climbing System
VARIO GT 24 Girder Wall Formwork
TRIO
SB Brace Frame
|
|
John Hansen
Formwork Superintendent
“We chose ACS for this project to achieve a 4 day cycle and save crane time. The MAXIMO wall form was much faster than conventional wood gang form panels.”
|
|
| Contractor: |
Bosa Construction, Burnaby, BC |
|
Field Service:
|
PERI Formwork Systems, Inc., Canada
PERI GmbH, Germany
|
|
|