Fogal Road Bridge, Brampton, Ontario


Efficient TRIO system design provides time saving in bridge abutment project



Graham Brothers Construction Limited is working on the extension of Fogal Road in Brampton, Ontario. This project consists of the construction of Fogal Road from The Gore Road to Regional Road 50. The scope of work includes a bridge structure and a four lane urbanized
roadway. Because of a tight project schedule Graham Brothers Construction decided to use the TRIO system to construct two bridge abutments each 3.30 m to 4.50 m high and 13.50 m to 15.00 m long.

PERI Systems In Use
  • TRIO
  • MULTIPROP System

  • Andy Vittins


    Project Manager

    “We achieved 50% time saving during formwork erection and dismantling. The surface finish of bridge abutment has made our designers quite pleased. Pre-engineered tie location on TRIO panel was a major time saver for us.”

    Contractor
    Graham Brothers Construction Ltd.,
    Brampton, ON
    Field Service: PERI Formwork Systems, Inc., Canada