The Bow, Calgary, Alberta In an area covering two city blocks in down town Calgary, the 59 storey, 236 m tall Bow office tower is under construction. The crescent shaped complex‘s southwest facing glass atrium, extends the full height of the building to maximize natural ...
Burlington Canal Lift Bridge The historical Burlington Canal Lift Bridge in Burlington Ontario is getting a major facelift.
In December 2009, PERI was awarded the contract to provide access scaffolding for the first phase of the job, providing suspended access scaffold ...
Scarborough Town Centre, Toronto, Ontario Scarborough Town Centre is a two level shopping centre located at the Highway 401 interchange at Mc Cowan Road in Scarborough, Ontario. The building includes a gross area of more than 120,770 m2 with more than 220 stores.
The mall has ...
Sunnybrook Expansion Project, Toronto, Ontario The most recent project in the Sunnybrook hospital is the “M” Wing expansion. The project is a vertical expansion of an existing 4 storey building, adding 4 floors and a mechanical penthouse. Once completed, 27,870 m2 extra space will be added ...
Goreway Station Combined Cycle Thermal Power Plant Project, Brampton, Ontario A crew consisting of approximately 50 men, worked around the clock setting up over 1,212,542 lbs (552,000 kg) of PERI UP scaffolding to keep up with the demand of over 15 sub trades at this site.