PERI Formwork Systems, Inc., Projects - Water Retaining Structures

Water Retaining Structures

Herridge Feedermain Valve Chambers, Mississauga, Ontario To meet the increasing demand for water in the west half of Mississauga and Brampton, a new water feedermain is being constructed from Lorne Park Water Treatment Plant to Herridge Reservoir in the City of Mississauga. Included in the scope ...
Combined Sewer Overflow Tank, Hamilton, Ontario To help with control of overflow of storm water, city of Hamilton decided to construct a 6,000 m3 capacity underground concrete storage facility together with a control building. Varcon Construction Corporation started construction work for ...
IHNC Floodwall, New Orleans, Louisiana Cajun Constructors, Inc. of Baton Rouge Louisiana was tasked with the $33.5 million dollar turn-key demolition and replacement of the 4,000 ft (1,219 m) N. Claiborne to Florida Ave. floodwall.
Bearspaw Wastewater Pre-Treatment Facility, Calgary, Alberta PERI worked with PCL on supplying the ideal amount of TRIO for this 22 month, $300 million concrete pre-treatment facility.
Walnut Creek Dam, Austin, Texas For this project, PERI offered the TRIO modular wall formwork system. Using only one type of connection device, called the BFD, multiple configurations of various panel sizes could be easily connected together.