Water Retaining Structures
|
To meet the increasing demand for water in the west half of Mississauga and Brampton, a new water feedermain is being constructed from Lorne Park Water Treatment Plant to Herridge Reservoir in the City of Mississauga. Included in the scope ...
|
|
To help with control of overflow of storm water, city of Hamilton decided to construct a 6,000 m3 capacity underground concrete storage facility together with a control building. Varcon Construction Corporation started construction work for ...
|
|
Cajun Constructors, Inc. of Baton Rouge Louisiana was tasked with the $33.5 million dollar turn-key demolition and replacement of the 4,000 ft (1,219 m) N. Claiborne to Florida Ave. floodwall.
|
|
PERI worked with PCL on supplying the ideal amount of TRIO for this 22 month, $300 million concrete pre-treatment facility.
|
|
For this project, PERI offered the TRIO modular wall formwork system. Using only one type of connection device, called the BFD, multiple configurations of various panel sizes could be easily connected together.
|