Scaffolding Construction

       1 | 2 | 3 | 4      

Burlington Canal Lift Bridge

To suspend the scaffolding from bridge structure, a DW15 tie is run between the MPB beams and through PERI UP standards. The tie is secured at top and at bottom with PERI wing nuts . The PERI UP standards are horizontally connected together using PERI UP UH 200 and UH 250 ledgers.