Scaffolding Construction
|
||
Burlington Canal Lift BridgeTo suspend the scaffolding from bridge structure, a DW15 tie is run between the MPB beams and through PERI UP standards. The tie is secured at top and at bottom with PERI wing nuts . The PERI UP standards are horizontally connected together using PERI UP UH 200 and UH 250 ledgers. |

